bad format productions music & media pro
  • LinkedIn Social Icon
  • SoundCloud Social Icon
  • Bandcamp Social Icon
  • YouTube Social  Icon
  • Facebook Social Icon
  • Instagram Social Icon

© BAD FORMAT LTD.

HDMI Cable Premium High Speed v2.0 Extra Long Lead 4K Ultra HD 3DTV 2160P 1080P

£15.99Price
Prefect for home studios and recording artists. Tested and recommended by Bad Format music & media production company. 
Connects HDMI-compatible device to your HDTV/display source. It combines HD audio & video into 1 cable for many home theatre needs. These heavy-duty and high speed HDMI 28AWG cables with solid copper conductors & corrosion-resistant gold-plated solid metal-shielding are made from premium materials for a pro-grade output. It allows for a shared internet connection among compatible devices, without extra wiring. 
 
Don't be fooled by thin Copper Clad Aluminium (CCA) cables. This beauty is made of 100% pure oxygen-free bare copper and is triple-shielded for maximum performance and ultra low SNR.
 
  • Returns

    Return accepted within working 5 days.

    Warning! Please return to the instructed return address on packaging label.

  • Delivery

    Fast & Free

    Your product will be with you within 2 to 3 working days.